Cleveland East Bank Flats Bulkhead

The project included the replacement for the steel sheet pile bulkhead along the Cuyahoga River. The improvement is located at the Flats East Bank site, between Main Avenue and Front Street west of the vacated Old River Road. The work includes driving new vertical and batter piles; driving new sheet piling, installing wales and steel connections, demolition of existing track platform; demolition of concrete pavement; excavation and embankment; installation of fenders; construction of a new CSO, and extension and abandonment of an existing CSO and other general site work. Strict observance of environmental considerations were crucial on this project.