Project Profile
Installation of an asphalt-paved all-purpose trail starting at Bacci Park in Cuyahoga Heights, and following the alignment of Warner Road to Garfield Blvd. in Garfield Heights. The project length is 4,871 ft. The scope of work includes surveying layout and staking, stormwater and sediment controls (SWPPP), clearing & grubbing, pavement demolition and repair, the construction of one pedestrian bridge, one concrete culvert with concrete segmented retaining wall wing walls, excavation and embankment, reinforced earth retaining walls, sidewalks and aprons, fencing, signage, topsoil placement, seeding, mulching, and tree placement.